In 2019, Berg supported the 4-zone TCU system replacement project by supplying a custom-designed Temperature Control Unit System to Carlisle SynTec Systems, a manufacturing facility specializing in roofing materials. The customized TCU unit model was crafted to mirror the configuration of the existing system, albeit with upgraded components and advanced controls.